Smart Village Admin. Bldg.

The Smart Village administrative building is over an area of 2,653 m² (where the built up area is 1,000 m² per floor) encompassing ground and 3 typical floor. In addition to that, there are 2 garage floors where each acquires 27 cars. Furthermore, the whole building is equipped with high performance glass curtain walls.

Location

 
The Smart Village is located on the Cairo – Alex desert road; which is just 10 minutes driving from downtown. Smart Village is the most prominent suburban office park in greater Cairo. It provides class A office buildings with all related amenities; unavailable anywhere else in Egypt. The smart village location makes it highly and easily accessible to central and downtown Cairo. Several governmental ministries will be relocating to Smart Village office park. Adding to this, there are several firms that have signed long term leases to relocate their headquarters to Smart Village Office Park.

Master Plan

 

Models

 
Main Bldg.

Main Bldg. Plans

 
Basement Floor

  Click to enlarge
Ground Floor Plan

  Click to enlarge
First, Second & Third Floors

  Click to enlarge

Finishing Specifications

 
Internal Finishing
Bathrooms
Bathrooms are egg shell
General
Integrated finishing paint, plastic white walls and ceilings.
Floors, plastic paint and finishing epoxy integrated service rooms and the burden of “Sornaga” tiles and walls paints.
General
The electromechanical work
Basement: full Business electromechanical (ventilation, electricity, health, fire), inclusive of all service rooms from:
- A transformer.
- Unit key ring.
- Stock full of the building.
- Birth of the full capacity of the building.
- Control room “BMS”.
- Chamber of security and surveillance (screens).
Elevators & Stairs
The main elevators and main stairs: a white finish “Halayeb” Granite. Double back and stainless steel handrail and false ceiling gypsum boards. Plastic painted wall with cladding sunny light marble.
The main elevators: full work of electromechanical (air conditioning, electricity, health, fire, elevator number 2 and 6 stops from the base of the basement until the third floor).
Fire exits
Escape ladders: epoxy paint ministries of the stairs and handrail with metal and plastic paint for walls & ceilings.

Services

 
Smart Village General Services
Greenery, Passages, club and highly developed security services.
Moreover, there is the whole domain maintenance that is being made with the highest quality.